project case

Duration : June 2020 – Present
Contract Name. : Contract No. 3403 Three Runway System Project New Integrated Airport Centres
Main Contractor : Sun Fook Kong Construction Limited
Trade : Roadwork and Utilities Work

Duration : Nov 2019 – Present
Contract Name. : Contract HY/2014/08-Central Kowloon Route Yau Ma Tei East
Main Contractor : Build King – SKEC Joint Venture
Trade : 1) Alternative Design for Reprovisioning of Gascoigne flyover
             2) Construction Of RC Structure for Access Shaft

Duration : August 2015 – August 2019
Contract Name:Contract HK/2012/08 Central – Wan Chai Bypass at
Wan Chai West
Main Contractor : China State- Leader Joint Venture
Trade : Construction of RC structure for CWB Tunnel
Duration : Oct 2015 – May 2017
Contract Name. : MTR Shatin to Central Link Contract 1112-Hung Hom Station & Stabling Sidings
Main Contractor : Leighton Contractors (Asia)Limited
Trade : Formwork and Concrete Placing at (HHS + BoH)
Duration : Feb 2017 – Nov 2017
Contract Name. : HY /2013/01 Hong Kong – Zhuhai – Macao Bridge
Main Contractor : Leighton – Chun Wo Joint Venture
Trade : HK Boundary Crossing Facilities-Passenge Clearance Building
Duration : June 2017 – Nov 2020
Contract Name. : Contract SS/D513 Construction of Columbarium and Garden of Remembrance at Tsang Tsui
Main Contractor : Leighton Contractors(ASIA) Limited
Trade : Formwork works + Concrete Placing works
Duration : June 2016 – Oct 2017
Contract Name. : Contract HK/2010/08 Central – Wan Chai Bypass-Tunnel (Slip Road 8 Section)
Main Contractor : China State Construction Engineering (HK) Ltd.
Trade : Construction of RC structure for SR8 Zone & CH526-CH-514 Tunnel Structure

Duration : August 2011 – December 2013
Contract Name. : CV/2007/03 -Site Formation & Infrastructure Works at Anderson Road
Main Contractor : China State Construction Engineering (HK) Ltd.
Trade : RC structure of underground water tank & related structure

Duration : August 2014 – September 2015
Contract Name. : Proposed Development for Hang Seng Management College
Main Contractor : Kaden Construction Limited
Trade : Supply, Installation & Removal of Formwork for Site F
Duration : July 2011 – Oct 2016
Contract Name. : HY/2009/19 Central- Wanchai Bypass-Tunnel (North Point Section) & Island Eastern Corridor Link
Main Contractor : Chun Wo -CRGL-MBEC Joint Venture
Trade : Formwork & Concrete for Bridge and other structure
Trade : ELS for Pile Caps, Tunnel Approach Ramp & Miscellaneous Location
Duration : January 2011 – December 2012
Contract Name. : Wan Chai Development Phase ll (HK/2009/02)
Main Contractor : Chun Wo -CRGL Joint Venture
Trade : Earthworks, Piling, Steelwork for Intake Culvert,Box Culvert N1& FRP-N Drain
Duration : January 2011 – December 2012
Contract Name. : Wan Chai Development Phase ll (HK/2009/02)
Main Contractor : Chun Wo -CRGL Joint Venture
Trade : Remaining Works of Cooling Mains at Harbour Road & Tonnochy Road

Duration : March 2009- April 2011
Contract Name. : Residential Development at No. 81 Broadcast Drive
Description : The Construction of a 3 9- storey low density residental building on top of
a podium transfer plate, & 2 storey basement car park.
Main Contractor : Paul Y. Builders Ltd.
Trade : Formwork & Façade installation

Duration : Jan 2009- Sept 2011
Contract Name. : CEDD Contract No. TP/2007/03 Remaining Infrastructure Works for Pak Shek Kok Development, Package 2D
Main Contractor : Paul Y. -Concentric Joint Venture
Trade : Formwork & Concrete Placing
Description : The construction of road L3(Part),L7, L7 bridge, staircase, cycle park, watermains & related landscapes
Duration : Jun 2008- Jan 2011
Contract Name. : “Caress Work Contract For Tai Wai Maintenance Centre Property
Development Ph.2, at STTL no. 529 ”
Main Contractor : Paul Y. Builders Ltd.
Trade : Formwork
Duration : July 2006- January 2010
Contract No. : HY/2003/19
Contract Name. : Improvement to Tung Chung Road Between Lung Tseng Tau & Cheung Sha.
Main Contractor : CCECC & CRWJ Joint Venture
Trade : (1) Structures for Bridges + (2) Retaining Walls(Formwork, Rebar Fixing & Concrete Placing)

Duration : June 2004 – May 2006
Contract No. : HY/2002/19
Contract Name. : “Widening of Yuen Long Highway Between Tan Kwai Tsuen
and Shap Pat Heung Interchange”
Main Contractor : Paul Y. Construction Co. Ltd.
Trade : (1)Formwork & Concreting for Bridge Decks, Abutment Walls, Columns & Pile Caps.
(2)RC Box Section for Retaining Wall WE4. –Formwork & Concreting.,

Duration : April 2003 – April 2005
Contract No. : SS L350
Contract Name. : “Construction of International Wetland Park and Visitor Centre
at Tin Shui Wai, Phase 2 Works”
Main Contractor : Chevalier (Construction) Co. Ltd.
Trade : “Formwork for Retaining wall, Visitor Centre, Satellite Building, Bird Hides,
Foot Bridges and related landscape works.”

More Case

Duration : June 2020 – Present
Contract Name. : Contract No. 3403  Three Runway System Project New Integrated Airport  Centres
Main Contractor : Sun Fook Kong Construction Limited
Trade : Roadwork and Utilities Work
Duration : Nov 2019 – Present
Contract Name. : Contract HY/2014/08-Central Kowloon Route Yau Ma Tei East
Main Contractor : Build King – SKEC Joint Venture
Trade : Construction Of RC Structure for Access Shaft
Duration : Nov 2019 – Present
Contract Name. : Contract No. HY/2009/19 Central-Wan Chai Bypass- Tunnel(North Point Section) & Island
Main Contractor : Chun Wo-CRGL-MBEC Joint Venture
Trade : Further Improvement Works for CWB of  Signage Works
Duration : Nov 2019 – Present
Contract Name. : Contract HY/2014/08-Central Kowloon Route Yau Ma Tei East
Main Contractor : Build King – SKEC Joint Venture
Trade : Alternative Design for Reprovisioning of Gascoigne flyover
Duration : June 2017 – Nov 2020
Contract Name. : Contract SS/D513 Construction of Columbarium and Garden of Remembrance at Tsang Tsui
Main Contractor : Leighton Contractors(ASIA) Limited
Trade : Formwork works + Concrete Placing works
Duration : Feb 2017 – Nov 2017
Contract Name. : HY /2013/01 Hong Kong – Zhuhai – Macao Bridge
Main Contractor : Leighton – Chun Wo Joint Venture
Trade : HK Boundary Crossing Facilities-Passenge Clearance Building
Duration : August 2015 – August 2019
Contract Name. : Contract HK/2012/08 Central – Wan Chai Bypass at Wan Chai West
Main Contractor : China State- Leader Joint Venture
Trade : Construction of RC structure for CWB Tunnel
Duration : April 2015 – Dec 2019
Contract Name. : Contract HK/2012/08 Construction of RC structure for CWB Tunnel
Main Contractor : China State- Leader Joint Venture
Trade : Drainage, Sewage and Roadwork
Duration :  June 2016 – Oct 2017
Contract Name. :  Central – Wan Chai Bypass-Tunnel (Slip Road 8 Section)
Main Contractor :  China State Construction Engineering (HK) Ltd.
Trade : Construction of RC structure for SR8 Zone & CH526-CH-514 Tunnel Structure
Duration : Oct 2014 – May 2017
Contract Name. : MTR Shatin to Central Link Contract 1112-Hung Hom Station & Stabling Sidings
Main Contractor : Leighton Contractors (Asia)Limited
Trade : Formwork and Concrete Placing at (HHS + BoH)
Duration : August 2014 – September 2015
Contract Name. : Proposed Development for Hang Seng Management College
Main Contractor : Kaden Construction Limited
Trade : Supply, Installation & Removal of Formwork for Site F
Duration : September 2013 – June 2017
Contract Name. : Shatin to Central Link- Contract No.1114 -Tsz Wan Shan Pedestrian Links
Main Contractor : Paul Y. Construction Company, Limited
Trade : Formwork
Duration : March 2013 – July 2016
Contract Name. : Express Rail Link Contract 824Tai Kong Po & Ngau Tam Mei Ventilation Building
Main Contractor : Kier-Kaden-OSSAJoint Venture
Trade : RC structures of Tai Kong Po & Nau Tam Mei Building
Duration : July 2011 – Oct 2016
Contract Name. : HY/2009/19 Central- Wanchai Bypass-Tunnel (North Point Section) & Island Eastern Corridor Link
Main Contractor : Chun Wo -CRGL-MBEC Joint Venture
Trade : Formwork & Concrete for Bridge and other structure
Duration : August 2012 – March 2014
Contract Name. : Contract 903- Ocean Park Station, Wong Chuk Hang Station, Viaducts & Aberdeen Bridge
Main Contractor : Leighton Contractors (Asia ) Limited
Trade : ELS and Piling Platform for Entrance A
Duration : June 2011 – Aug 2016
Contract Name. : HY/2009/19 Central- Wanchai Bypass-Tunnel (North Point Section) & Island Eastern Corridor Link
Main Contractor : Chun Wo -CRGL-MBEC Joint Venture
Trade : ELS for Pile Caps, Tunnel Approach Ramp & Miscellaneous Location