project case
Duration : June 2020 – Present
Contract Name. : Contract No. 3403 Three Runway System Project New Integrated Airport Centres
Main Contractor : Sun Fook Kong Construction Limited
Trade : Roadwork and Utilities Work
Duration : Nov 2019 – Present
Contract Name. : Contract HY/2014/08-Central Kowloon Route Yau Ma Tei East
Main Contractor : Build King – SKEC Joint Venture
Trade : 1) Alternative Design for Reprovisioning of Gascoigne flyover
2) Construction Of RC Structure for Access Shaft
Contract Name:Contract HK/2012/08 Central – Wan Chai Bypass at
Wan Chai West
Main Contractor : China State- Leader Joint Venture
Trade : Construction of RC structure for CWB Tunnel
Contract Name. : MTR Shatin to Central Link Contract 1112-Hung Hom Station & Stabling Sidings
Main Contractor : Leighton Contractors (Asia)Limited
Trade : Formwork and Concrete Placing at (HHS + BoH)
Contract Name. : HY /2013/01 Hong Kong – Zhuhai – Macao Bridge
Main Contractor : Leighton – Chun Wo Joint Venture
Trade : HK Boundary Crossing Facilities-Passenge Clearance Building
Contract Name. : Contract SS/D513 Construction of Columbarium and Garden of Remembrance at Tsang Tsui
Main Contractor : Leighton Contractors(ASIA) Limited
Trade : Formwork works + Concrete Placing works
Contract Name. : Contract HK/2010/08 Central – Wan Chai Bypass-Tunnel (Slip Road 8 Section)
Main Contractor : China State Construction Engineering (HK) Ltd.
Trade : Construction of RC structure for SR8 Zone & CH526-CH-514 Tunnel Structure
Duration : August 2011 – December 2013
Contract Name. : CV/2007/03 -Site Formation & Infrastructure Works at Anderson Road
Main Contractor : China State Construction Engineering (HK) Ltd.
Trade : RC structure of underground water tank & related structure
Contract Name. : Proposed Development for Hang Seng Management College
Main Contractor : Kaden Construction Limited
Trade : Supply, Installation & Removal of Formwork for Site F
Contract Name. : HY/2009/19 Central- Wanchai Bypass-Tunnel (North Point Section) & Island Eastern Corridor Link
Main Contractor : Chun Wo -CRGL-MBEC Joint Venture
Trade : Formwork & Concrete for Bridge and other structure
Trade : ELS for Pile Caps, Tunnel Approach Ramp & Miscellaneous Location
Contract Name. : Wan Chai Development Phase ll (HK/2009/02)
Main Contractor : Chun Wo -CRGL Joint Venture
Trade : Earthworks, Piling, Steelwork for Intake Culvert,Box Culvert N1& FRP-N Drain
Contract Name. : Wan Chai Development Phase ll (HK/2009/02)
Main Contractor : Chun Wo -CRGL Joint Venture
Trade : Remaining Works of Cooling Mains at Harbour Road & Tonnochy Road
Duration : March 2009- April 2011
Contract Name. : Residential Development at No. 81 Broadcast Drive
Description : The Construction of a 3 9- storey low density residental building on top of
a podium transfer plate, & 2 storey basement car park.
Main Contractor : Paul Y. Builders Ltd.
Trade : Formwork & Façade installation
Contract Name. : CEDD Contract No. TP/2007/03 Remaining Infrastructure Works for Pak Shek Kok Development, Package 2D
Main Contractor : Paul Y. -Concentric Joint Venture
Trade : Formwork & Concrete Placing
Description : The construction of road L3(Part),L7, L7 bridge, staircase, cycle park, watermains & related landscapes
Contract Name. : “Caress Work Contract For Tai Wai Maintenance Centre Property
Development Ph.2, at STTL no. 529 ”
Main Contractor : Paul Y. Builders Ltd.
Trade : Formwork
Contract No. : HY/2003/19
Contract Name. : Improvement to Tung Chung Road Between Lung Tseng Tau & Cheung Sha.
Main Contractor : CCECC & CRWJ Joint Venture
Trade : (1) Structures for Bridges + (2) Retaining Walls(Formwork, Rebar Fixing & Concrete Placing)
Duration : June 2004 – May 2006
Contract No. : HY/2002/19
Contract Name. : “Widening of Yuen Long Highway Between Tan Kwai Tsuen
and Shap Pat Heung Interchange”
Main Contractor : Paul Y. Construction Co. Ltd.
Trade : (1)Formwork & Concreting for Bridge Decks, Abutment Walls, Columns & Pile Caps.
(2)RC Box Section for Retaining Wall WE4. –Formwork & Concreting.,
Duration : April 2003 – April 2005
Contract No. : SS L350
Contract Name. : “Construction of International Wetland Park and Visitor Centre
at Tin Shui Wai, Phase 2 Works”
Main Contractor : Chevalier (Construction) Co. Ltd.
Trade : “Formwork for Retaining wall, Visitor Centre, Satellite Building, Bird Hides,
Foot Bridges and related landscape works.”
More Case
Duration | : | June 2020 – Present |
Contract Name. | : | Contract No. 3403 Three Runway System Project New Integrated Airport Centres |
Main Contractor | : | Sun Fook Kong Construction Limited |
Trade | : | Roadwork and Utilities Work |
Duration | : | Nov 2019 – Present |
Contract Name. | : | Contract HY/2014/08-Central Kowloon Route Yau Ma Tei East |
Main Contractor | : | Build King – SKEC Joint Venture |
Trade | : | Construction Of RC Structure for Access Shaft |
Duration | : | Nov 2019 – Present |
Contract Name. | : | Contract No. HY/2009/19 Central-Wan Chai Bypass- Tunnel(North Point Section) & Island |
Main Contractor | : | Chun Wo-CRGL-MBEC Joint Venture |
Trade | : | Further Improvement Works for CWB of Signage Works |
Duration | : | Nov 2019 – Present |
Contract Name. | : | Contract HY/2014/08-Central Kowloon Route Yau Ma Tei East |
Main Contractor | : | Build King – SKEC Joint Venture |
Trade | : | Alternative Design for Reprovisioning of Gascoigne flyover |
Duration | : | June 2017 – Nov 2020 |
Contract Name. | : | Contract SS/D513 Construction of Columbarium and Garden of Remembrance at Tsang Tsui |
Main Contractor | : | Leighton Contractors(ASIA) Limited |
Trade | : | Formwork works + Concrete Placing works |
Duration | : | Feb 2017 – Nov 2017 |
Contract Name. | : | HY /2013/01 Hong Kong – Zhuhai – Macao Bridge |
Main Contractor | : | Leighton – Chun Wo Joint Venture |
Trade | : | HK Boundary Crossing Facilities-Passenge Clearance Building |
Duration | : | August 2015 – August 2019 |
Contract Name. | : | Contract HK/2012/08 Central – Wan Chai Bypass at Wan Chai West |
Main Contractor | : | China State- Leader Joint Venture |
Trade | : | Construction of RC structure for CWB Tunnel |
Duration | : | April 2015 – Dec 2019 |
Contract Name. | : | Contract HK/2012/08 Construction of RC structure for CWB Tunnel |
Main Contractor | : | China State- Leader Joint Venture |
Trade | : | Drainage, Sewage and Roadwork |
Duration | : | June 2016 – Oct 2017 |
Contract Name. | : | Central – Wan Chai Bypass-Tunnel (Slip Road 8 Section) |
Main Contractor | : | China State Construction Engineering (HK) Ltd. |
Trade | : | Construction of RC structure for SR8 Zone & CH526-CH-514 Tunnel Structure |
Duration | : | Oct 2014 – May 2017 |
Contract Name. | : | MTR Shatin to Central Link Contract 1112-Hung Hom Station & Stabling Sidings |
Main Contractor | : | Leighton Contractors (Asia)Limited |
Trade | : | Formwork and Concrete Placing at (HHS + BoH) |
Duration | : | August 2014 – September 2015 |
Contract Name. | : | Proposed Development for Hang Seng Management College |
Main Contractor | : | Kaden Construction Limited |
Trade | : | Supply, Installation & Removal of Formwork for Site F |
Duration | : | September 2013 – June 2017 |
Contract Name. | : | Shatin to Central Link- Contract No.1114 -Tsz Wan Shan Pedestrian Links |
Main Contractor | : | Paul Y. Construction Company, Limited |
Trade | : | Formwork |
Duration | : | March 2013 – July 2016 |
Contract Name. | : | Express Rail Link Contract 824Tai Kong Po & Ngau Tam Mei Ventilation Building |
Main Contractor | : | Kier-Kaden-OSSAJoint Venture |
Trade | : | RC structures of Tai Kong Po & Nau Tam Mei Building |
Duration | : | July 2011 – Oct 2016 |
Contract Name. | : | HY/2009/19 Central- Wanchai Bypass-Tunnel (North Point Section) & Island Eastern Corridor Link |
Main Contractor | : | Chun Wo -CRGL-MBEC Joint Venture |
Trade | : | Formwork & Concrete for Bridge and other structure |
Duration | : | August 2012 – March 2014 |
Contract Name. | : | Contract 903- Ocean Park Station, Wong Chuk Hang Station, Viaducts & Aberdeen Bridge |
Main Contractor | : | Leighton Contractors (Asia ) Limited |
Trade | : | ELS and Piling Platform for Entrance A |
Duration | : | June 2011 – Aug 2016 |
Contract Name. | : | HY/2009/19 Central- Wanchai Bypass-Tunnel (North Point Section) & Island Eastern Corridor Link |
Main Contractor | : | Chun Wo -CRGL-MBEC Joint Venture |
Trade | : | ELS for Pile Caps, Tunnel Approach Ramp & Miscellaneous Location |