Contract No. HY/ 2003/ 19

Project Name : Improvement to Tung Chung Road Between Lung Tseng Tau And Cheung Sha

Trade : R.C. Structure for Bridges - Formwork, Rebar Fixing, Concreting

Main Contractor : CCECC & CRWJ 中國土木工程集團公司暨中鐵五局部(集團)有限公司聯營

Duration : July 2006 -

Highlights of Bridges STR19.

2006-9-21 Bridge STR 19
Formwork erection at utility trough

2006-08-29
Light scaffolding on top of Bailey Truss (30m Span)

2006-9-20 Bridge STR 19
Formwork erection at bridge deck

Abutment STR19 on 2006-08-08


Bridge STR19 on 2006-08-18
Bailey Truss

Bridge STR19 on 2006-08-24
Light Scaffolds on top of Bailey Truss

Abutment STR19 on 2006-08-24

Abutment STR19 on 2006-08-24


Bridge STR19 (at different angle) on 2006-08-29

Bridge STR19 Bridge deck on 2006-08-29

Bridge STR19 Bridge deck-Circular Formwork mould on 2006-08-29

Bridge STR19 Abutment


2006-10-17 Bridge STR 19
F5 finish to soffit of bridge deck

Highlights of Bridges STR08.

Abutment STR08 on 2006-08-10

Abutment (inner) STR08 on
2006-08-10

Abutment STR08 after formwork demolished on 2006-08-29

2006-11-3 Bridge STR08


2006-11-03 Bridge STR08
F5 finish to column (12m height)

2006-11-20 STR08 Installation of quadshore

2006-11-28 STR08 Placing Bailey Truss into position

2006-12-09 STR08 Assemble Formwork on Bailey Truss


Coupling section at prestress bridge

2006-11-13 STR8 column (13m height)


Highlights of Bridges STR17.

2006-12-20 STR17

2006-12-20 Bridge STR17
Formwork Erection

2007-01-03 Bridge STR17
Erection of UC with 100T mobile crane (temporary work)

2007-02-02 Bridge STR17 Quadshore at mid span


2007-12-01 Bridge STR17
F5 finish to soffit of bridge deck

2007-12-01 Staircase
Profiled Formwork Surface


Highlights of Bridges STR9, STR10, STR14 and STR18.

Bridge STR09 Rebar Fixing at bottom slab

Bridge STR09 rebar fixing for links

Bridge STR09 rebar fixing for links

2007-02-07 Bridge STR09
Formwork erection at utility trough


2007-01-23 Bridge STR9

2007-02-26 Bridge STR10 Abutment erection of quadshore

Brigde STR18 at 2008-03-11

Brigde STR14 at 2007-5-25


Highlights of Bridge STR13.

Formwork erection – abutment

General cleaning at bridge deck

F5 formwork finish to bridge deck

Erection of precast conerete parapet


STR13 column (13m height)

F3 ribbed finish to abutment

Temporary bridge near STR13 at 2007-5-17

STR 13 Falsework – UC placed on megashore


HY/2003/19 Improvement to Tung Chung Road.

Installation of precast parapet

Excavation of pile cap

Precast Parapet on site

Insitu parapet with steel formwork


Erection of Bailey Truss

Formwork (Bridge deck) to F5 finish

Insitu parapet to F5 finish

Light Duty Scaffold at abutment


Excavator – Site Formation

Light duty scaffold on blinding layer