Contract No. HY/ 2002/ 19

Project Name : Widening Of Yuen Long Highway Between Tan Kwai Tsuen and Shap Pat Heung Interchange

Trade : Structure Works for Bridge Decks, Abutment Walls, Columns & Pile Caps.

Main Contractor : Paul Y. Construction Co. Ltd.

Duration : June 2004 -

”@

Widening of Yuen Long Highway

Retaining Wall WE4 Top Slab
10.09.2004

Retaining Wall WE4 base slab
10.07.2004

Retaining Walls WE 4 16.8.2005

Retaining Wall WE 3 16.8.2005

Retaining walls WE5, WE5A, WE6& WE7 Bridge N731

Erecting formwork for abutment N752 Erecting steel column for Bridge N710B  27.3.2005 Bridge N710B Erecting formwork for parapet  29.04.2005 Bridge N710B Removing UB from portal frame

Bridge N710B Erecting formwork for bridge deck 14.08.05 Bridge N719 West Abutment 03.08.2005 Bridge N710B Removing false work Bridge N711 Using 500T mobile crane to displace precast bridge deck 23.3.05

Bridge N711 Using 500T mobile crane to displace precast bridge deck 23.3.05 Bridge N711 Works completed successfully Bridge N731 North deck Bridge N751

Bridge N751 Formliner-Style”„Buffalo”¦

Bridge N751

Bridge N751 extended bridge Bridge N732

Bridge N710B

NS 203 North

Bridge N710B at Long Tin Road Bridge N752 Excavation for pile cap 15.10.2004

”@